Drum Drive

AKA planetary drive or main drive or main gearbox unit.
Drives the drum around and therefore the spiral belt without this the spiral would be static.
Gearbox and motor supplied with low temperature coating ( coating needed for freezer not a chiller or cooler).
On double drum machines they will have 2 of these, 1 for each drum.
Machine will not run without this.
We recommend keeping one Drum Drive in stores.

Product Description

Drum Drive

This is the main geared motor in the spiral system also known as a main gearbox unit, main drive unit or planetary drive unit. It drives the drum which in turn drives the Spiral Conveyor Belt with a Tension Drive Unit countering the driving motion of Drum Drive Unit to keep the Spiral Conveyor Belt taut, in a single drum friction driven system, we also supply gearboxes for Direct Drive Systems, where the Spiral Conveyor Belt is driven by the teeth in the drum which engage with the teeth on the edge of the spiral belt. This is a vital part of the machine, even more so for a double drum spiral system as there are 2 gearboxes – either one failing brings production to a standstill, and it’s imperative to keep at least 1 Drum Drive Unit in stores in case of a breakdown, its a long lead time item meaning any breakdown will cause production quotas not to be met for the entire duration of manufacture and delivery of the part.

Drum Drive Units are specified bespoke to suit each machine, and are low temperature coated for spiral freezer applications to ensure they operate efficiently in sub zero temperatures for a longer period comparatively.

With extensive knowledge in the industry and knowing Eurotek Spiral Freezers, Chillers and Coolers better than anyone else you can trust Korutek to provide you with a like for like OEM replacement part with manufacturers warranty for added assurance. Just provide us with the Eurotek machine’s serial number and let us do the rest!

Our strong supplier relationships mean that we can get these parts to you at a competitive price with a shorter lead time comparatively.

Our safecontractor accredited installation and commissioning engineers ensure that the parts are installed with safety in mind in accordance to safety protocols, minimising risks and, by utilising their experience, minimise the time needed and disruptions on site as well as reducing the possibility of the issue reoccurring.

We can supply parts for Eurotek Spirals as well as providing replacement parts for IQF Inline Freezers and other brand spirals.

Why choose Korutek for your machine critical spare parts:

N
Like for like replacement (OEM Parts)
N
Warranty
N
Safe installation
N
Minimal disruption
N
Credibility of supplier
N
Trust & Knowledge
N
Increase machine life
N
Reduce risks of fault reoccurring
N
Hands off
N

Quality & consistency of your end consumer product

Critical Spares

Spare Parts Enquiry

"*" indicates required fields

Name*
This field is for validation purposes and should be left unchanged.

Do you provide international delivery?

Yes, we deliver nationally or internationally.

Do you provide installation?

Yes, we install the parts nationally or internationally.

What if I don’t know which part is needed?

We offer a full machine inspection which will find the cause, recommend solutions and identify any other potential critical issues early on so any unplanned downtime and breakdowns are avoided.

I have a Eurotek Spiral, do I need to measure the parts and provide you with any technical info?

For Eurotek machines, you will only have to provide us with the machine serial number for us to be able identify the technical specifications of the required part/s.

Do the parts come with any warranty?

The majority of our parts come with 1 years manufacturer’s warranty. We can discuss extended warranties if wanted.

More Critical Spare Parts

Please see our list of spiral freezer spare parts we recommend customers keep in stores in case of breakdowns.

These are critical spare parts with long lead times, that your machine can’t operate without.

This means if you don’t have these parts to hand and the particular part broke down your machine would be out of production for the duration of the ex works lead time plus delivery time.